Weeks. Uncalled for. Will be honest: got lazy, might have purchased a jeep that's taking up spare time (as did the search and purchase).
Catching up: Finished previous structure, sort of. Had a historic wall (still standing about 2 ft. out of ground) cutting it in half. It was finished, but a few days ago I was removed to assist in monitoring the trackhoe machine scrape. Scraped out a full EB and started another. She finished the post cuts (numerous but I helped w/ the S section) and we finalized paperwork today in the lab. Not how I'd have finished it, but as I was removed from the project in the end I can't complain. Watching machine scrape w/ JB has been enlightening and exciting. It's like the sneak peek at a movie the weekend before it comes out (Sandra Bullock's new one this Sat. @7pm) Anywho, found some neat looking structures in this next EB, lots of historic bs cutting, but what are you going to do? Should be a good time.
*note on the previous structure: had lots of burning/incitu evidence. Found timbers on floor. That was exciting.
But, going back to monitoring machine scrape tomorrow or boxing flots in the lab if it rains. Please God don't let it rain.
No comments:
Post a Comment