18 September 2010

The Bottom Line

Trudging along in eb48. Only 3 conglomerates open at the moment. 2, not so conglomerate-y things going, but they'll be done in short order as well as one of the clusters. MCT and I are thinking late Nov. I could see it being done sooner. Took a long day to get the pictures of the MER/HEN opus in lieu of allowing the pending rain to destroy a full day of work. Then, it didn't rain. Ah well. Done is done, and it as done right. That's what counts really.

/4 is going strong, land form is dropping off so hopefully machine scraping will be winding down. Started in the back 9 saving the southern stuff. Hopefully the Store will come down soon and we'll be able to open up to the highway and get /6 expanded.

Writing more music, need to put it down and get this disc done. Contemplating replacing all the old stuff, not sure yet. Trying to find creative ways to fill out the sound. Looking into household percussion instruments.

Still some weekend left, lemon out.

No comments:

Post a Comment